Syclone #1,563 Project

Next Phase

New member
Hello All,

Just getting started with my project. Doing research, collecting parts... and wanted to document it here.

Purchased the truck earlier this year from a member here in SC with 36k miles. (Already swapped the battery and alternator.) Goal for the truck is making it a reliable street / strip truck that will also see yard work (mulch and trips to Home Depot).

Plans so far are to address the brakes, suspension, wheels / tires, paint, cladding and last step will be a boosted LS3 and keeping AWD. Have thoughts about swapping it to a manual 6 speed. Last step may be updating the interior, but that won't be anytime soon.

Look forward to sharing the progress and I'm sure I'll have a ton of questions going through the upgrades.

-Marko


Pic of when it was picked up in SC:






July 3rd:
Put in 10 hours into the paint / full detail on the Sy with a friend of mine. Wash, clay bar, compound, polish, wax and Back to Black on the cladding.

Some pics after the detail:








Parts collected / ordered:
  • Pendaliner bed liner
  • Extang full tilt tonneau cover
  • OEM ZR-1 wheels 17 x 9.5'', 11'' rear
  • SportMachines Coilover kit, rear shocks
  • Belltech leaf springs & 1'' lowering blocks.
    Mark Williams input shaft / adapter

Still need to order:
  • Brake kit - front / rear (Corvette F/R)
  • E-brake kit
  • Rear brake lines
  • Rotors / calipers / pads

On deck:
Sourcing LS3 / 4L80

Completed:
AC Delco Alternator / Battery
Syclone banner - Sportmachines
Paint correction
Plugs / Wires 11/16
OEM ZR-1 wheels / Nitto NT05's (275/315) 11/2016

 
Last edited:
Top